| Building Fee Schedule |
State surcharge is $.00265 per cubic foot on new buildings & additions. For all others, the State surcharge is $1.35 per $1000. Minimum fee for each subcode is $50.00. |
| New Building |
$.030 per cubic foot |
| Addition |
$.030 per cubic foot |
| Alteration: first $50,000 |
$30 per $1000 |
| Alteration: next $50,000 |
$24 per $1000 |
| Alteration: over $100,000 |
$18 per $1000 |
| Roofing R3/R5 |
$50.00 |
| Siding R3/R5 |
$50.00 |
| Fence |
$50.00 |
| Sign |
$2.00 per square foot |
| Pool - Above Ground |
$150.00 |
| Pool - In Ground |
$500.00 |
| Asbestos Abatement |
$150.00 |
| Lead Hazard |
$150.00 |
| Demolition |
$2,500.00 |
| Demolition, R3 less than 5000 sf, 30ft |
$250.00 |
| Certificate of Occupancy (CO) |
$50.00 |
| CO Asbestos |
$50.00 |
| Certificate of Continued Occupancy (CCO) |
$200.00 |
| Use Group Change |
$200.00 |
| Certificate for Clearance for Lead |
$100.00 |
|
|
Electrical Fee Schedule
Minimum Fee is $50.00 |
| Receptacles and Fixtures |
| First 50 |
$40.00 |
| Each additional -25 |
$ 10.00 |
|
|
| Motors & Electrical Devices over 1 hp |
| Up to 10 hp |
$15.00 |
| Up to 50 hp |
$50.00 |
| Up to 100 hp |
$100.00 |
| Larger than above |
$500.00 |
|
|
| Transformers & Generators over 1 kw |
| Up to 10.0 kw |
$15.00 |
| Up to 45.0 kw |
$50.00 |
| Up to 112.50 kw |
$100.00 |
| Larger than above |
$500.00 |
|
|
| Service Panels, Entrances and Subpanels |
| Up to 200 amps |
$50.00 |
| Up to 1000 amps |
$100.00 |
| Larger than above |
$500.00 |
| Pool |
$150.00 |
|
|
Plumbing Fee Schedule Minimum Fee is $50.00 |
| Water Closet |
$15.00 |
| Urinal / Bidet |
$15.00 |
| Bath Tub |
$15.00 |
| Lavatory |
$15.00 |
| Shower |
$15.00 |
| Floor Drain |
$15.00 |
| Sink |
$15.00 |
| Dishwasher |
$15.00 |
| Drinking Fountain |
$15.00 |
| Washing Machine |
$15.00 |
| Hose Bibb |
$15.00 |
| Stacks |
$15.00 |
| Water Heater |
$45.00 |
| Fuel Oil Piping |
$40.00 |
| Gas Piping |
$25.00 |
| Steam Boiler |
$75.00 |
| Hot Water Boiler |
$75.00 |
| Sewer Pump |
$75.00 |
| Interceptor / Separator |
$75.00 |
| Backflow Preventer |
$15.00 |
| Grease Trap |
$75.00 |
| Sewer Connection |
$75.00 |
| Water Service Connection |
$75.00 |
|
|
Fire Protection Fee Schedule
Minimum Fee is $50.00 |
| Storage Tanks |
| Storage Tanks |
$50.00 |
|
|
| Alarm / Supervisory / Signaling |
| First 12 |
$50.00 |
| Each additional 50 |
$50.00 |
|
|
| Wet & Dry Sprinkler Heads |
| 1 - 20 |
$75.00 |
| 21 - 100 |
$135.00 |
| 101 - 200 |
$240.00 |
| 201 - 400 |
$620.00 |
| 401 - 1000 |
$945.00 |
| Over 1000 |
$1,150.00 |
| Standard Pipes |
$240.00 |
|
|
| Pre-Engineered Systems |
| Wet Chemical |
$150.00 |
| Dry Chemical |
$150.00 |
| CO2 Suppression |
$150.00 |
| Foam Suppression |
$150.00 |
| Halon Suppression |
$150.00 |
|
|
| Miscellaneous |
| Kitchen Hood Exhaust System |
$150.00 |
| Smoke Control Systems |
$500.00 |
| Gas or Oil Fires Appl |
$50.00 |
|
|
| Municipal Ordinance |
| Certificate of Continuing Occupancy (CCO) |
$100.00 |
| Emergency CCO (within 72 hours) |
$150.00 |
| Emergency CCO (within 24 hours) |
$200.00 |
| (Fees revised as per Municipal Ordinance #18-07 adopted on 5/16/07)
|